Section
Segment

Leirubakki

The area is at a distance of over 20 km from the wind farm.
The visual impact is somewhat negative.


Photo:

Distance to wind farm  21.4km

  • Date: 31.08.2015
  • Time:16:50
Section
Section
Segment

The EIA is based on wind turbines with a mast height of 149 m, blades at the highest position and a generation capacity of 3.2 MW. A 200 MW wind farm would require 63 wind turbines. The greatest distribution of equally spaced turbines constructed up to the periphery of the site is assumed when analysing the maximum impact of the wind farm.

Section
Section
Segment

Rest areas

Overview of photo location

Click on the map to travel between rest areas.

Rest areas
Power stations

Shaded areas on the map show the number of visible wind turbines within the area